From initial exploration to successful delivery

A single, disciplined execution chain — planned carefully, mobilized efficiently and handed over in order.

Execution

Our operational approach

Seven connected phases, each with clear deliverables, responsibilities and HSE controls.

  1. 01

    Exploration & assessment

    Objectives, geological setting and exploration risk are defined with the operator.

  2. 02

    Seismic acquisition

    Survey design, line preparation, acquisition, processing and interpretation.

  3. 03

    Engineering & planning

    Well design, operational programme, procurement and logistics planning.

  4. 04

    Mobilization

    Location construction, rig and equipment move, derrick installation and crews.

  5. 05

    Drilling & well services

    Drilling, cementing, testing and completion under technical supervision.

  6. 06

    Field development

    Production planning, optimization, workover and maintenance.

  7. 07

    Project handover

    Documentation, demobilization and orderly close-out.

Contracting

The right contract for the project

In both models the scope can extend from location preparation to well completion and handover.

Process stacks against a blue sky
Model A

Turnkey services

Integrated project execution under a defined contractual scope, from planning and mobilization to completion and handover.

  • Single point of responsibility
  • Defined project scope
  • Integrated project management
  • Logistics and supply coordination
  • Cost and schedule control
Drilling rig on location
Model B

Day-rate services

Provision of equipment, technical personnel and operational support under the client's direction.

  • Flexible contract duration
  • Operator-controlled programs
  • Equipment and personnel
  • Adaptable operational scope
  • Transparent pricing structure
Mobilization & logistics

Prepared sites, coordinated supply, safe moves

Much of a project's schedule risk sits before the first metre is drilled. We plan roads, locations, procurement and rig moves as one integrated workstream.

  • 01Road and drilling location construction
  • 02Equipment and material logistics
  • 03Rig mobilization, derrick installation and dismantling
  • 04Procurement, material supply and coordination
Mobile unit on a desert locationField operations